B2Z was contracted to perform Construction Management, Inspection and Material Testing for the Regional Linear Park Project Section 2. This portion of the project is 2.64 miles of hike & bike trail starting at Ridge Road and ending at Hall Acres Road in Pharr, TX. This project consisted of the construction of a 10-foot wide, asphalt paved, shared-use trail system built on a new location with 3 pedestrian tunnel crossings under major roadways. Once completed, the entire Regional Linear Park hike & bike trail will ultimately connect the cities of McAllen, Pharr and San Juan.