
April 8, 2024
US77
B2Z was contracted to provide Geotechnical Site Investigation, Boring Logs and Geotechnical Engineering Analysis / Design (Bridge Foundations, Retaining Wall Analysis) for the US 77 PS&E Corridor Upgrade Project. The project involves the upgrading of an at-grade divided highway for a total of approximately 44 miles to interstate standards (to comply with requirements for I-69).
Date | 06 Oct, 2020 |
---|---|
Client | TEXAS DEPARTMENT OF TRANSPORTATION |
Location | Austin, Tx |
Service | GEOTECHNICAL ENGINEERING & MATERIAL TESTING |