b2zengineer

MONTE CRISTO RD & CONWAY RD DRAINAGE IMPROVEMENTS

MONTE CRISTO RD & CONWAY RD DRAINAGE IMPROVEMENTS

B2Z was contracted by HCDD1 to analyze the existing conditions of the watershed area around the project limits and design additional detention solutions to alleviate chronic flooding throughout the area.  Work performed by B2Z, but not limited to, was to conduct a H&H study and PS&E plan set.

Date 06 Oct, 2020
Client HIDALGO COUNTY DRAINAGE DISTRICT NO. 1 (HCDD1)
Location Mission, Tx
Service Drainage Design