Author: Mikael

  • Hello world!

    Welcome to WordPress. This is your first post. Edit or delete it, then start writing!

  • US77

    US77

    B2Z was contracted to provide Geotechnical Site Investigation, Boring Logs and Geotechnical Engineering Analysis / Design (Bridge Foundations, Retaining Wall Analysis) for the US 77 PS&E Corridor Upgrade Project. The project involves the upgrading of an at-grade divided highway for a total of approximately 44 miles to interstate standards (to comply with requirements for I-69).

  • REGIONAL LINEAR PARK PHASE II

    B2Z was contracted to perform Construction Management, Inspection and Material Testing for the Regional Linear Park Project Section 2. This portion of the project is 2.64 miles of hike & bike trail starting at Ridge Road and ending at Hall Acres Road in Pharr, TX. This project consisted of the construction of a 10-foot wide,…

  • BORDER TRANSPORTATION MASTER PLAN

    This project is a multimodal, binational transportation plan to address challenges, issues, opportunities and needs for moving goods and people across the Texas-Mexico border. Meetings are held every two to three months including Binational Regional Steering Committee (BNRSC) meetings that include key public officials to work with the Border Trade Advisory Committee (BTAC) and TxDOT…

  • SH365 TOLL DIGITAL TERRAIN MODEL PROJECT

    B2Z was contracted to provide aerial photography and generate a Digital Terrain Model (DTM) for the 365 Toll project. Work performed by B2Z included Field Reconnaissance, UAS Aerial Imagery, Ground Control Data Collection, Post flight Data Processing and DTM Creation.

  • WACO BRIDGES

    B2Z was contracted to provide Geotechnical Site Investigation, Boring Logs and Geotechnical Engineering Analysis / Design (Bridge Foundations, Retaining Wall Analysis) for an overpass along FM 116 at SH 9 in Coryell County, SH 6 over Lake Waco in McLennan County and SH 174 over Lake Whitney in Hill County. These services are being provided…

  • HCDD1 ADMINISTRATION BUILDING

    HCDD1 had outgrown their current administration facilities and needed additional office space to accommodate their growing team of administration professionals, civil engineers and supporting staff.  HCDD1 worked with a local architect to develop plans and specifications for their new 10,000 square foot facility, and after plans were complete, turned to B2Z to assist with an…

  • SAN JUAN COMMUNITY RESOURCE CENTER (CRC) YOUTH FACILITY

    Hidalgo County and the Urban County Program collaborated to fund a youth facility that could host after school and summer programs for local area youth. The San Juan CRC Youth Facility houses the “Boys and Girls Club” of Pharr, services elementary through high-school age children and provides a much-needed outlet for the community youth. B2Z…

  • CITY OF MISSION GIS SERVICES

    B2Z was contracted by HCDD1 to analyze the existing conditions of the watershed area around the project limits and design additional detention solutions to alleviate chronic flooding throughout the area. Work performed by B2Z, but not limited to, was to conduct a H&H study and PS&E plan set.

  • MONTE CRISTO RD & CONWAY RD DRAINAGE IMPROVEMENTS

    B2Z was contracted by HCDD1 to analyze the existing conditions of the watershed area around the project limits and design additional detention solutions to alleviate chronic flooding throughout the area. Work performed by B2Z, but not limited to, was to conduct a H&H study and PS&E plan set.