B2Z was contracted to provide Geotechnical Site Investigation, Boring Logs and Geotechnical Engineering Analysis / Design (Bridge Foundations, Retaining Wall Analysis) for the US 77 PS&E Corridor Upgrade Project.  The project involves the upgrading of an at-grade divided highway for a total of approximately 44 miles to interstate standards (to comply with requirements for I-69).